So you want to implement a project management office (PMO) in your organization? Our four-phase guideline will help you find your way.

Implementing a PMO is a project like any other and therefore needs careful planning. A thorough analysis of the current situation in the organization forms the basis for a tailored concept for the project management office. When an organization introduces a PMO for the first time, it is particularly important to adapt it to the organization’s specific conditions and actual needs.

Transparency as a Success Factor

If you are thinking about introducing a PMO, the most important success factor is transparency towards all stakeholders at every step of the process. Executive management, department heads and employees should all stand behind the decision and actively support it. To achieve this, make sure there is full transparency, stakeholder involvement and continuous communication before, during and after the implementation. This is how you get all key stakeholders on board and lay the foundation for a successful PMO implementation.

How to Implement a PMO

A lean start with clearly defined services creates acceptance and makes it possible to scale later. Clear communication about the implementation process and the goals it is meant to achieve is just as important.

The 4 phases of implementing a PMO

Phase 1: Analyze the Current Situation

As with any other project, it is advisable to start by analyzing the current situation in the organization. This gives you detailed insights into the current project management maturity and lets you identify some of the requirements for the new PMO for the first time. The analysis covers project management methods, processes and tools as well as the projects currently underway.

Also create a project list that shows which projects the PMO will be responsible for. This list will later make it easier to estimate how many people you need in which PMO roles and which tasks the PMO should take on.

Phase 2: Create a Concept

In this phase, you develop a realistic concept for the PMO, based on the analysis of the current situation and the requirements already identified. You then define the PMO’s goals with measurable KPIs. In other words, you decide which type of PMO it should be: an operational PMO, a controlling PMO or a strategic PMO. The goal and orientation of the PMO determine its actual areas of responsibility and the measurable results associated with them.

Next, derive the necessary areas of responsibility and determine the resources required. Your concept should also already define important project management processes and methods, which the PMO will then apply in all projects.

Phase 3: Implement the PMO

In the implementation phase, you put the concept into practice step by step. By now at the latest, the PMO manager fills the positions in the PMO. Make sure the PMO team is well trained and prepared for its future tasks. Invest in training and workshops to ensure the team is qualified.

Once the team is in place, you implement the concept, the project management processes and the methods together, one after the other. Clear communication is crucial here: what is being introduced, why and when? That is what the people affected want to know. For the PMO to succeed, and for its guidelines to be applied successfully, everyone needs to understand why the measures make sense.

In this sense, the implementation phase is the change phase, in which people switch to new and sometimes unfamiliar ways of working. Plan enough time for this phase so as not to overwhelm employees.

Phase 4: Transition into Normal Operation and Continuous Improvement

The implementation phase is followed by normal operation with continuous improvement. You and everyone else who supervised the implementation but has no active role in the project management office now step back and hand over completely to the PMO manager and the PMO team.

After the handover, the PMO carries out all tasks independently. This includes continuously improving the processes it has introduced and adapting them to changing conditions. The PMO should always keep in mind that it acts proactively and deals with changes in day-to-day business as flexibly as possible.

This requires knowledge, experience and good judgment to assess which processes and methods must be followed because of regulations, when processes need to be adapted to achieve better results as quickly as possible, and how these changes can be embedded sustainably in the project teams and the entire organization.

Read the other articles in our PMO series or use our detailed whitepaper on implementing a project management office