Customers
Success story
Success story ·
Electrical engineering

SGB-SMIT Group
integrates InLoox successfully into the global enterprise infra­structure.

How one of the world’s leading power transformer manufacturers aligned project workflows across six production sites in five countries.
Company
SGB-SMIT Group
Industry
Electrical engineering
Solution area
Cross-site project workflows & reporting
Using InLoox since
Contents

The SGB-SMIT Group is one of Europe’s leading mid-sized transformer manufacturers, offering large power transformers, cast-resin transformers and special units. The group’s company profile already shows how far its network of subsidiaries and sales offices reaches: “Utilities and industrial companies all over the world rely on the products of the SGB-SMIT Group and its companies in Germany, Malaysia, the Netherlands, Romania and the United States.” A structure this widespread means that internal workflows, in day-to-day work and above all in planned projects, must always be aligned and available at any time. Because of the distances involved, this is not always easy in practice.

Until then, project management at the SGB-SMIT Group relied on common standard tools such as Microsoft Excel and Microsoft Project. At some point, this was no longer enough for the project leads to keep project workflows equally clear and coherent across all locations, or to align them with one another.

The project teams struggled above all because not everyone involved had access to all project documents, with the general handling of the software tools in use, and with the data consolidation workflows. Time-consuming problems kept occurring here.

Special transformer by SGB-SMIT
Special transformer by SGB-SMIT. © SGB-SMIT Group

A fast evaluation phase: from three to one

Those responsible at the SGB-SMIT Group decided to evaluate the project management solutions available on the market together with the external consulting firm Enxion, Dr. Kirchner. The consultants shortlisted three products and put them through comprehensive, practical test runs together with the SGB-SMIT team.

A team made up of the head of IT, the head of development and an IT administrator simulated exactly the scenarios that day-to-day work brings. The test phase began in the second quarter of 2013 and involved around ten project managers at the various SGB-SMIT locations. One of the first steps was to transfer the project data held in Excel files into the new application environment of each software.

Evaluating the products and comparing their advantages and disadvantages went relatively smoothly, so the test and integration phase was already completed in the third quarter. During testing, the team quickly chose InLoox PM for Outlook, among other reasons because it was the easiest to integrate into the existing IT infrastructure and fully in line with the company’s internal Business Strategy 2018.

Collaboration with internal and external employees and project participants

The project leads at the SGB-SMIT Group placed particularly high demands on the collaboration features of the future project management solution. The larger a project, the more people are involved. The previous infrastructure could not provide truly efficient, real-time synchronization of all tasks and results.

For employees working on projects, this meant creating tables in Microsoft Excel, sending them manually by email and then laboriously searching the resulting pool of data for all relevant records and reconciling them. Microsoft Project at least made it easier to coordinate project steps, although it saved little time.

What was also missing was meaningful, comprehensive reporting. After InLoox PM for Outlook was introduced, coordination among all project participants improved. Compiling the necessary documents, drafts and schedules also became straightforward and efficient from then on. In addition, those responsible emphasize that InLoox solved the problem of inadequate reporting satisfactorily.

Standardized internal workflows free up capacity, create transparency and reduce workload

“Integrating the InLoox software into Microsoft Outlook was the decisive step toward convenient project planning for us,” says the head of IT at the SGB-SMIT Group. “The company has approved a new business strategy which will simplify workflows and processes within the group in the coming four years. It was therefore necessary to adapt more complex processes like project management and align them with the new business strategy.”

The entire team sees clear advantages in using the project management software, including financial ones. The company saves valuable resources on a large scale because fewer man-hours are needed. This in turn reduces the workload of employees and gives project management an unprecedented overview of all activities and sub-steps of every project.

Around 300 employees currently work actively with the InLoox application. Most of them are internal, but project participants at external locations are involved as well, which requires a complete connection. Introducing the InLoox solution was therefore a major step forward for the SGB-SMIT Group, above all for its often widely separated locations.

InLoox for future locations as well

The SGB-SMIT Group is growing continuously. Thanks to the good results in day-to-day use, the InLoox solution is planned for all future subsidiaries as well, which is why the group chose an enterprise license that allows any number of employees to work with the software. Maintaining the project management software takes just two people per location, including a deputy. Around 20 employees per location enter information and data into the management system.

About the SGB-SMIT Group

The SGB-SMIT Group is one of the world’s leading manufacturers of power transformers.

Its products are needed wherever electrical energy is generated, transmitted or used: in power plants, wind farms, solar power systems, power grids, industrial companies and means of transport such as trains or ships.

Headquartered in Regensburg, the company produces at six plants in five countries: Regensburg, Neumark, Nijmegen (Netherlands), Nilai (Malaysia), Louisville (USA) and Sibiu (Romania).

In 2014, its 1,900 employees generated annual sales of around EUR 500 million. The product range extends from large power transformers, medium power transformers, small power transformers, oil-immersed distribution transformers and cast-resin transformers to variable shunt reactors and phase shifters, all the way to Lahmeyer Compact Substations®.

Transformers from 50 kVA up to and including 1,200 MVA, with voltages up to 800 kV.

The SGB-SMIT Group sells its products through sales offices and agents in more than 40 countries.

The company has customers in more than 50 countries.

Head of IT
The company has approved a new business strategy which will simplify workflows and processes within the group in the coming four years. It was therefore necessary to adapt more complex processes like project management and align them with the new business strategy.
Head of IT
SGB-SMIT Group
3
months to complete the evaluation phase
300
employees actively work with InLoox

Similar requirements?
Let’s talk.

30 minutes with an InLoox expert. No slides.