New features:

- Added detail window in resource overview with direct link to the project
- Average resource load in resource overview (red/green line)
- Re-design of the integrated project list
- Re-design of the work package list
- Progress bar when sending notifications
- Multithread support when sending notifications
- Sending notifications when deleting a project
- Appointment request for external resources
- Copy planning view to clipboard
- Arbitrary values can be entered in the planning resources dialog -> time is calculated accordingly
- If a Project is opened through the project details the planning tab is activated and the correspondent planning is selected
- Added printing to the work package list
- Extended reporting to support listing of groups directly from project (to get planned and assigned work for each group)
- Added some properties for reporting to achieve current - planned overview
- Override permission can be set under "Other" options tab to change phase flag & progress although no planning modify permission is present
- Added options for showing additional controls on ActionDialog (Phase progress & flag)

Improvements:

- Improved InLoox startup process
- Problem with English meeting report solved
- Fixed bug in planning where an overlap can be produced
- Correct multi folder selection problem in Outlook
- Fixed focus problem from an open project window called from the work package details
- Fixed calculation problem of minutes in planning dialog, where minutes in calculation result in wrong values
- Fixed refresh of budget overview values
- Corrected a bug with budget positions, where IsBilled is checked but in the asset dialog it was set wrong if it was an invoice
- Improved UNC resolution
- Fixed bug with drawing the duration of grouping element, when it is created through subgroups
- Fixed bug when loading MPX

InLoox 5.6.5 (May 5th 2009)

New feature:

- Print of the resources overview and resources load available

Improvements:

- Working time and working hours per day are correctly transfer with the MPX export
- Modified work package list authorization
- Error while closing Outlook with opened project fixed
- Incorrect sorting of planning items fixed
- “Statement from WorkpackageList (STRG+ALT+F2)” error message fixed
- Error when closing modified Sharepoint-Server documents fixed
- Error with negation of the filter in the project list fixed

InLoox 5.6.7 (June 12th 2009)

New features:

- Multi selection in resource overview shows workload of selected resources
- "Project customer" and "Project priority" as new column in work package list available
- Modified planning notification dialog, dialog shows transmitted emails
- Day of week is shown in the timeline of the planning area

Improvements:

- Problem with adding new activity without budget permissions solved
- Permission issue in documents solved

InLoox 5.6.9 (September 25th 2009)

New features:

- Contact information dialog in project for contacts which are no more available in Outlook
- Add new activity from global activity list (customer project)
- Own action access and own action modify permission (customer project)

Improvements:

- Activity budget positions could be modified with special permission set
- Budget overview is refreshed if activities are booked through "Add Element"

InLoox 5.6.10 (November 2nd 2009)

Improvements:

- MS Outlook 2007 service pack 2 Performance problem in combination with InLoox fixed
- MS Outlook folder integration bug solved
- Import of MS Project planned costs to InLoox additional planning costs
- MS SharePoint connectivity problems solved

InLoox 6.0 (January 13th 2010)

New features:

- Copy & Paste function
- Mind Map function
- Dashboard function
- Graphic budget overview
- Type-safe user-defined fields
- Project timeline view
- Outlook 2007 visual style with Ribbon user surface
- System width DIN nomenclature
- Global view control with extended view storage
- InLoox quick access panel in existing and new mail
- InLoox quick access panel in Outlook task and calendar entry
- InLoox quick access panel in Outlook contacts
- Email templates with own designer
- Synchronization between InLoox planning elements and calendar entries/Outlook tasks
- Project number editable
- Customer administration with customer number
- File tree view in documents
- Budget status can be marked as budget neutral
- Individual resources costs in planning billable
- Planned expenses as own budget type
- Report designer with improved performance and many further fields
- Report designer with value for count of elements in sub containers
- InLoox recommend function
- InLoox evaluate function
- Suppress notification for done activities and work packages
- Division as further project field
- Marking from InLoox booked Outlook elements
- System width holidays for page planning definably
- Critical path in planning representable
- Microsoft Project 2007 support
- Central InLoox administration
- Extended filter function for list views available

InLoox 6.0.1 (January 20th 2010)

New feature:

- 2nd search domain support for permissions

Improvements:

- Refresh problem in work package list in connection with oracle fixed
- Problem with creating a new document fixed
- Refresh problem after changing the project document folder solved

InLoox 6.0.2 (March 3rd 2010)

New features:

- Tray Icon information if no database connection is available
- Document link in planning element now directly points to project document folder, if available
- All windows are shown on main monitor if second monitor is deactivated

Improvements:

- Fixed calculation of revenue in project list
- Booking of recurring appointments
- Parts of the time entry dialog can be faded out
- The category column is now also shown in the list of archived projects
- Deletion of budget positions using multi selection
- Added project number and name to sub containers in report generator
- Synchronization of planning element with calendar
- Save button in ribbon quick access area
- Documents can be directly saved to sub folders using “Add Element”
- Improvement on document loading
- Enhanced handling of special characters
- Migration on Oracle database
- Compute project progress after migration
- Fixed wrong calendar weeks
- Fixed showing interchanged role in contact quick access area (customer/partner)
- Improvements with upgrade of InLoox 5
- Client number can be changed
- Display of custom fields

InLoox 6.0.3 (April 23rd 2010)

New features:

- Dynamic loading of the InLoox add-in. Outlook starts without delay
- Support for lower resolutions, e.g. for netbooks
- New Russian localization
- Exported project plan now contains WBS code

Improvements:

- Fixed bug with contacts in reports
- Calendar week numbering is now according to Microsoft Outlook
- Improved migration from InLoox 5
- Notify resources if removed from the plan
- Removed unnecessary notification of resources
- Information is shown if document path length exceeds the system limit
- Drag&Drop import of reports
- Fixed loading of planning templates with custom fields

InLoox 6.0.4 (June 21st 2010)

New features:

- Overwriting planning and mind map templates
- Create new folders from the documents page

Improvements:

- Improved performance of project lists and time recording lists
- Improvement of caching of new emails
- Garbage collection on closing a project
- View of all posts billed fixed in project list
- Recursion while adding new contact groups to a project
- Error in Drag & Drop in reports fixed
- All folders on document page displayed
- Error in dependencies when importing a template corrected
- Bug fixed: Com object separated from RCW client
- Bug fixed: Invalid Index (Exception at HRESULT: 0x8002000B (DISP_E_BADINDEX))
- Bug in shifting planning elements fixed
- Example data in reporting added

InLoox 6.5 (July 30th 2010)

New features:
- Full support for Microsoft Outlook 2010, 32 bit and 64 bit versions
- Updates report designer with an improved PDF export, new barcode types and a user-friendly print control, which enables simultaneous output to different devices and formats
- “Performed by” column is available in budget position time entries

Improvements:
- Faster MS-Exchange contact resolution using minimum privileges
- Updated report engine, designer translations and added new data field (DurationWorkingHours)
- Reports optimized
- Fixed handling of deleted cost groups in planning and planning templates
- Changed InLoox Personal Edition database to improve performance and support 64 bit systems
- Improved InLoox Server installation for MySQL and Oracle database systems
- Removed special characters from subject when adding e-mails to documents
- Fixed null value exceptions with Oracle databases

InLoox 6.5.1 (August 13th 2010)

Improvements:
- Pie chart widget labels added
- Project delete with role permission possible
- Mind map node dialog save selected symbol
- Outlook 2000/2002/XP support added
- Outlook 2007 missing tool bars added
- Ribbon menu buttons localized
- Bug fixed: "Message: The width and height of the Rectancle {X=0,Y=0,Width=0,Height=19} could not be 0 (null)."
- Exchange offline availability added

InLoox 6.6 (November 17th 2010)

New features

Improvements

InLoox 6.5.2 (September 16th 2010)

Improvements:
- "Message: Attempted to read or write protected memory. This is often an indication that other memory is corrupt." error fixed
- Bug based on the Microsoft KB2293428 security update solved
- Missing ribbon translation added
- Oracle database update error from InLoox version 5.6.x to InLoox version 6.5.x fixed
- Outlook update contact error fixed
- Ribbon quick tips added

InLoox 6.7.3 (May 17th 2011 current version)

New features:

Improvements:

InLoox 6.7.1 (March 4th 2011 current version)

Improvements

InLoox 6.7 (February 25th 2011)

New features

Improvements

InLoox 6.7.4 (June 21st 2011 current release)