Improvements:
- Fixed issue in planning notification
- Fixed issues in french translation
- Fixed issue in document preview
- Improved performance in budget and manage section
- Fixed issue when exporting reports as Micorsoft Word
- Fixed issue when importing planning templates
- Fixed issue in budget permission
- Fixed stack overflow under Office 2007
- Fixed issue when saving custom fields in budget positions
- Fixed issue when loading project contacts - Fixed "Null Reference Exception" when sending notifications
InLoox PM 7.6.2 (May 27th 2013)
New Features:
- Add new relations Mindmap.Nodes.Documents, Planning.Documents, and Time Tracking.Documents to report designer
Improvements:
- Translate missing Italian, French, Spain and Russian language labels
- Fix time tracking permission bug
- Fix repaint bug in Outlook 2003/2007 tasks
- Fix “Object reference not set to an instance of an object“
- Fix bug while grouping start date in global time tracking list
InLoox PM 7.6.1 (April 17th 2013)
Improvements:
- Improved memory usage - Improved performance to Oracle databases
- Corrected translations
- Fixed issue if no standard printer has been configured
- Fixed issue regarding defective views in newly created databases
- Fixed stop watch issue when time has been booked from paused state
- Fixed issue in project notes which caused project notes to be always displayed in default font and style
- Fixed problem which didn’t save view of work package list
- Fixed problem which set the provision date of an time tracking entry to the current date while coping to a different project using multi selection - Fixed permission issue while booking time tracking entries using the work package list
InLoox PM 7.6 (March 1st 2013)
New Features:
- Add MS Windows 8 (32/64 Bit) support
- Add MS Office 2013 (32/64 Bit) support
- Add InLoox PM view only license
- Improved project dialog performance
- Improved Outlook start behavior
- Improved address book performance
- Add contact migration feature
- Add new command parameters for silent terminal server installation available (LOG, TERMINALSERVER, VISIBLEALL)
Improvements:
- System date format with two digit year supported correctly
- Work package list now updated on outlook startup correctly
- Mind map node dialog now locked correctly in read only mode
- Suppress locking if dialogs are opened in read only mode
- Fix Outlook hang while saving mind map with custom fields
- Fix exception while exporting mind map with custom fields
- Fix history refresh interval
- Modify scroll behavior in address book dialog
- Document preview not updated if preview panel is not visible
- New Time tracking entries linked to activities are initialize with resource costs
- Activity fields in time tracking item now locked correctly
- Fix preview handler exception in 32bit outlook
- Fix exception in project recycler dialog
- Enter opens planning dialog in Gantt view
- Fix close behavior in document copy progress dialog
InLoox PM 7.5.1 (February 2nd 2013)
Improvements:
Improved caching behavior in gantt table
Improved memory usage in projects and Outlook
Fixed problem regarding multi selection while editing a document
Fixed issue where locked mind map nodes could be edited
Fixed issue where name of the current editing user has been display as “UNKNOWN”
InLoox Options can now be unlocked manually
Fixed issue which caused grouping and filter problems in several grids
Fixed issue regarding the registration of MSSQLCE during the installation of InLoox PM Personal Edition upgrade
Fixed issue where only the purchase price and not the disposition price has been updated after editing the related time tracking entry
Fixed issue where time tracking duration has been set to zero after switch from end date to duration
Column order of the gantt table will now be saved
Fixed issue in quick contact selection in several dialogs
Fixed issue regarding connection to oracle database
Fixed issue which cause a dialog in the documents section to stay open
Fixed issue where calculations of values in Email templates were wrong
InLoox PM 7.5 (December 21st 2012)
New Features:
InLoox PM for Outlook can be connected to InLoox now!
Support for Windows 8 and Office 2013 (32 Bit)
New view “Timeline” to visualize project changes
Notification dialog now allows selection and cancellation of resource notification when closing the project
When the button „No notification“ in the planning is being deactivated, all resources assigned to the project will be notified, also retroactively
Set activity progress to done from the work package list
Improvements:
Reset the project auto-increment number
Performance improved
Update of the report generator
Fixed issues regarding Skill-Feature
InLoox PM 7.1 (March 2nd 2012)
New Features:
Revised and improved performance of the Resource Overview
Info Dialog now shows all information incl. Outlook version
Information can be copied to clipboard
Implemented List & Label 17 SP1 (Also Excel Export on 64Bit)
Added new functionality for custom time span in outer resource overview
Added field chooser to work package widgets
Changed license handling for Terminal server to support Terminal Server Farms
Improved memory handling
InLoox PM Personal Users are now able to use InLoox PM Notification for their own contact
Advanced Reporting (Gantt, Multisorting, Speed)
Improvements:
Fixed resource overview calculation
Planning keeps correct sorting also when importing several templates
Fixed exception when searching InLoox contacts
Fixed empty recipient after mail drag&drop (Project Documents)
Fixed help link when using other languages than German or English
Fixed issue with importing InLoox PM Personal into InLoox PM Workgroup
"Logon as" button now also available when all licenses are used
Fixed issue with refreshing the document list
Fixed issue SharePoint Upload
Fixed issue with document tree build up on SharePoint
Fixed issue with SharePoint library containing "ä, ö, Ü..."
Fixed issue with SharePoint library containing "." - was changed with "_" in the past
ClientDB synchronization with SharePoint List, now syncs with root lists
Fixed several exceptions
Fixed issue where plannings did not show clip icon if they hat connected documents
Color is set correctly if copy mind map to planning
Improved element locking in budgets
Exchange is deactivated as default for resource overview (reduces unnecessary waiting time)
Fixed issue where reference was not immediately updated, when copying an element with custom fields.
Fixed issue when removing deleted projects from the trash
Fixed issue which lead to an Outlook crash, when printing the budget overview
Improved Undo/Redo in planning
Fixed issue where resource did not get notified when removed from planning
Improved performance when sending resource notifications
InLoox PM 7.0.4 (December 9th 2011)
Improvements:
Revised and improved Performance of InLoox PM in Outlook and exchange of data between InLoox PM and its database.
Enhanced compatibility of Microsoft Project Import/Export.
Integrated List&Label 16 Service Pack (16.007).
Fixed issue regarding the registration of the Security Manager.
Fixed incorrect display of over-allocated resources in the resource overview.
Fixed incorrect display of e-mails in the document preview.
Fixed issue regarding insertion of e-mail templates.
Fixed issue regarding authentication at Microsoft Share Point.
Fixed issue which prevented to load the proper user settings of the document preview layout.
Fixed issue regarding incorrect links sent from the documents.
Fixed issue regarding incorrect calculation of non-working days in the planning.
InLoox PM 7.0.3 (November 15th 2011)
Improvements:
- Fixed issue in budget migration from Version 6 to Version 7.
- Fixed locking issue in budget section if two or more users are accessing the budget.
- Fixed issue which sent out notifications when opening the resource overview.
- Fixed issue where users were not able to filter by skills in the Contact-Dialog (Outlook 2003).
- Planning lag will no longer be lost when exporting to MS Project 2010.
- Document folder will now be updated automatically.
InLoox PM 7.0.2 (November 9th 2011)
New Features:
- It is now possible to add multiple license keys during the installation.
- Planning templates can now be imported via Drag&Drop.
- The tracked time can now be booked while closing Outlook.
Improvements:
- Fixed issue during the update of a MySQL database.
- Fixed issue which caused the activities to be set at the project start after an upgrade from version 6 to version 7.
- Performance and memory usage have been improved.
- Fixed issue which prevented the outlook process from being terminated.
- Fixed issue which caused incorrect times from the stop watch.
- Fixed issue which caused that nothing is displayed within the resource overview.
InLoox PM 7.0.1 (October 21st 2011)
Following features have been implemented with InLoox PM 7.0.1:
- User Interface:
The complete user interface has been redesigned inspired by the Outlook 2010 Ribbon Design
Each dialog has been redesigned and is now scaleable
Project note history has been implemented:
Users are now able to leave comments (RTF) in projects. Value, Date and author will be tracked.
RichText has been implemented in:
Mindmap Node description
Activity description
Time Tracking description
Document description
Budget position description
Project note history
Custom fields are now acting like standard-program fields and are more user-optimized
- Planning section:
Backwards planning has been implemented
The contact selection while adding a new resource has been improved. A quick selection containing all contacts who are related to the project (such as project manager or team) has been implemented
The complete overall allocation of a resource within the start and the end of an activity is now visible in the planning dialog.
Planning elements can now be colored in every color of the RGB spectrum.
Custom calendars has been implemented
Custom multiple working times for each day has been implemented
The following dependencies are now available:
Start to Start
Start to End
End to Start
End to End
The following constraints are now available:
Start on
End on
As soon as possible
As late as possible
No later than
No earlier than
Undo-Redo function for the planning section has been implemented.
Lag is now calculated and displayed
Overlapping of planning elements has been implemented
Planning elements can now be edited directly inline
The planning can now be filtered, sorted and grouped by various attributes
The visual display of the constraints within the planning dialog has been improved:
The display of the available activities is has now the same look as the planning
The display of the already constrained elements has been improved with more information about the element itself.
- Document overview:
Document preview:
A preview of the selected document has been implemented. The preview can be displayed right to the document list to the bottom of the document list and can be deactivated.
Outlook recipient (To, CC, BCC) has been added to the document list
Documents (incl. Multi selection) can now be send by email directly from the document overview
Document links:
Documents can now be linked to the following project elements:
Mindmap elements
Planning elements
Time tracking elements
Documents can be link 1:n to every kind of the above elements.
- Time tracking using the stop watch
A stop watch has been integrated in the work package list and the task section of Windows.
The tracked time can been booked directly on a project without opening it
- The display of the activities within the time tracking dialog has been matched the planning for a better overview.
- Creating new folders within the project structure has been improved:
The dialog for creating folders has been completely redesigned. It now shows the complete folder tree.
Folders can be created and or renamed here.
- The resource overview is now completely integrated in Outlook as a view. No modal window will be opened anymore.
- Email templates are now customizable:
Following properties of email templates can now be customized:
To
CC
BCC
Subject
It’s possible to choose from project information (such as Project Manager or Team) and free text.
- The latest version of the report designer has been implemented.
- The Skill-Management System has been implemented:
It’s now possible to create skills in the InLoox-Options and assign skills to contacts (Contact 1:n skills).
Contacts can now be filtered by the assigned skills in the contact selection dialog.
- Multi selection and multi edit has been implemented in the following sections:
Planning section
Time tracking section
Budget section
Documents section
- The resource overview start from within the project has been redesigned inspired by the Outlook 2010 Ribbon Design.
- Microsoft Project 2010 support has been implemented.
- MySQL 5.5 support has been implemented
- Budget overview:
The budget section came under a complete redesign.
Planned expenses do now have an own list in the budget
Purchase price and selling price are now generally available in the budget positions.
All currently selected positions can now be billed via one button.
Budget positions do now have their own context sensitive ribbon tab.